Sign In | Join Free | My fazendomedia.com
China Guangzhou Cleanroom Construction Co., Ltd. logo
Guangzhou Cleanroom Construction Co., Ltd.
GCC : You All-in-one Cleanroom Construction and Solutions Partner
Verified Supplier

5 Years

Home > Prefab Cleanroom >

Aluminum Profile GMP Cleanroom , 0.45m/S Iso Class 8 Clean Room

Guangzhou Cleanroom Construction Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Aluminum Profile GMP Cleanroom , 0.45m/S Iso Class 8 Clean Room

Brand Name : GCC

Certification : QS/SC

Place of Origin : China

MOQ : 1 Set

Price : Negotiation

Payment Terms : T/T, L/C

Supply Ability : 1000 Sets/Month

Delivery Time : 14-30 Workdays

Packaging Details : Plywood Box

Project : GMP Cleanroom

Style : Simple

Frame : Aluminum Profile

Wall : Magnesium Sandwich Panel

Characteristic : Control Air Cleanliness

Using Field : Workshop

Contact Now

GMP Cleanroom

GMP requires a cleanroom or clean area for pharmaceutical manufacturing. Within the GMP there are further standards for the materials used in the construction of a cleanroom or area compliant with GMP. All materials must be able to withstand frequent cleaning and disinfection. Additionally, materials must be free of cracks, smooth and level, and able to interlock seamlessly. Particulate materials may not be used due to the risk of contamination. Aside from GMP compliance, other factors such as durability, ease of installation, and cost come into consideration when designing a cleanroom. At Clean we will guide you through the design process step by step to ensure that both GMP standards, your needs, and your budget are all satisfied.

GMP Cleanroom Walls

Cleanroom walls and ceilings should be bright and clean, fade resistant, smooth and even, and easy to clean. Common materials for cleanroom walls include stone, Choi steel, and Terrazzo, which are often coated in a special paint. For especially damp production environments that are difficult to keep clean, Vitrolite (porcelain) walls may be used. However, in this case it is crucial that the material is applied evenly and sealed with no cracks to minimize the risk of contamination. We recommend Choi steel and/or paint coating for best results.

GMP Cleanroom Floors

(1) Cleanroom floors are required to be smooth and level, scratch resistant, impact resistant, easy to clean, high integrity, and free of cracks. In addition, GMP cleanroom floors must be anti-static and possess sufficient weight bearing capacity.

(2) Cleanroom floors must be moisture resistant. To achieve this, install a buffer layer below the concrete foundation layer and use an elevated floor.

(3) Approved floor surface coatings: a) Inelastic Surface - Terrazzo / b) Painted Surface (film) - acrylic, epoxy, polyurethane; self-leveling - self-leveling epoxy resin / c) Elastic Facing Material - PVC Plastic Flooring

GMP Cleanroom Doors And Windows

Doors used in cleanrooms must be smooth and even, easy to clean, of simple design (no door sill), and must open in the direction or the cleanest area that they connect. Cleanroom doors must be sealed when not in use to preserve the positive pressure environment. In order to avoid mold and deformation, wooden doors should never be used in clean areas or cleanrooms.

Windows in cleanrooms should be smooth and even, of simple design, resistant to dust collection, and installed flush with interior walls (no windowsill). Cleanroom windows should not be made of wood. Windows installed between clean areas and non-clean areas should consist of at least two layers, with at least one of those layers being a non-moveable pane.

GMP Cleanroom Requirements For Health Products

(1) An appropriate air quality and temperature control system must be installed according to the type of health product being manufactured and the proximate environment.

(2) The manufacture and packaging of pills, tablets, caplets, soft capsules, powders, medicinal teas, pastes and related products should abide by the guidelines set forth in GMP for D level cleanrooms. The manufacturer may further optimize the manufacturing and packaging environment and facilities depending on the exact nature of the product.

Level Of Airborne Particulate Cleanliness In Prefab Cleanrooms

Level Maximum Particles/m3 Equivalent 
  ≥0.1 μm ≥0.2 μm ≥0.3 μm ≥0.5 μm ≥1 μm ≥5 μm
ISO 1 10b d d d d e  
ISO 2 100 24b 10b d d e  
ISO 3 1000 237 102 35b d e Class 1
ISO 4 10000 2370 1020 352 83b e Class 10
ISO 5 100000 23700 10200 3520 832 d,e,f Class 100
ISO 6 1000000 237000 102000 35200 8320 293 Class 1,000
ISO 7 c c c 352000 83200 2930 Class 10,000
ISO 8 c c c 3520000 832000 29300 Class 100,000
ISO 9 c c c 35200000 8320000 293000 Room Air

Specification Table

Area 15㎡ 30㎡ 50㎡ 100㎡
Material Aluminum frame/Baking steel plate/lnsulating glass window
FFU class 1-100 12pcs 24pcs 48pcs 96pcs
FFU class-1K 3pcs 6pcs 9pcs 18pcs
FFU class-10K 2pcs 4pcs 6pcs 12pcs
Speed (m/s) 0.45m/s ±20% 0.45m/s ±20%
Temperature (optional) 18-28°C
Humidity (opiional) 50-70% 50-70%
Illumination 400-800LUX
Power 2.4-7kw 4.8-10kw 9.6-19kw 19.2-30kw

Why Choose Us

Gcc is one of the leaders in modular cleanrooms industry that can provide you with the most cost-effective cleanroom solutions according to your require or give you professional advice.


Product Tags:

0.45m/S Iso Class 8 Clean Room

      

Aluminum Profile GMP Cleanroom

      

0.45m/S GMP Cleanroom

      
Best Aluminum Profile GMP Cleanroom , 0.45m/S Iso Class 8 Clean Room wholesale

Aluminum Profile GMP Cleanroom , 0.45m/S Iso Class 8 Clean Room Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Cleanroom Construction Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)